Follow us :

6HL beer fermentation tanks and 20HL bright beer tank were finished and will ship to customer.

sourceDYM brewing solutions

publisherSherry Liu

time2021/10/27

After 45 days of production, our team finished the fabrication of 6 pcs of 6HL beer fermentation tanks and 1 pc of 20HL bright beer tank. All the tanks have been finished the quality inspection before loading yesterday. We also measured each ports, manway and height of tank, in order to make sure everything is the same with drawing. We have sent the final photos to customer and waiting for the feedback.

6HL beer fermentation tanks  and  20HL  bright beer tank  were finished and will ship to customer.

After 45days of production, our team finished the fabrication of 6 pcs of 6HL beer fermentation tanks and 1 pc of 20HL bright beer tank.  All the tanks have been finished the quality inspection before loading yesterday. We also measured each ports, manway and height of tank, in order to make sure everything is the same with drawing. We have sent the final photos to customer and waiting for the feedback. We plan to load them into container on 3rd Nov and will ship them to customer’s brewery in the middle of Nov.


All the tanks have the separate temp. controller to monitor temp. inside each tank. We can provide customized solution of all your needs. If you want to get more information, please contact with:
Jessica Zhao
Mobile: +86-139 4086 7350
Email: jessica.z..........com

Image